Establish
Existing supply point from an authorised safe position
The Lusitano Diaries · Act 2: Make something useful
A simple diagram reveals why garden water and drinking water must stay distinct.
Planned chapter — not filmed or released. The brief is a proposal; actual access, suitability, resources and permissions must be established.
The opening question
Document existing provision and draw separate potable, irrigation and wastewater questions.
The story in three shots
Existing supply point from an authorised safe position
Hands sketching three separate water flows
Close-up of labels and outstanding questions
Shot ideas only. Film actual work with appropriate consent; label illustrative reconstructions or AI concepts.
What would count as evidence?
Confirmed supply information, labelled concept flows and unresolved servicing questions.
Keep actual dates, spending and time beside the result. A plan or a sent request remains a plan or a sent request until the outcome is evidenced.
The useful pause
No plumbing, water treatment, abstraction or discharge changes without appropriate review.
This outline is not a technical method statement, building survey or permission to begin work.
A soundtrack thought
Roots reggae · Earlier Portugal-origin concept track. A creative reference for this chapter, subject to a fresh production and rights review.
Open the earlier source track ↗Take it into your own notebook
Use the brief to prepare questions and record a small, appropriate project. Downloading it does not start or complete a mission.
Download the chapter brief